Where Is Asbestos Found in Buildings?
Any non-domestic building built or refurbished before 2000 may contain asbestos-containing materials (ACMs). For surveyors, architects and asset managers, knowing where ACMs are likely to be is essential. It shapes how a building is managed, how a project is designed and costed, and whether intrusive work can start safely and on time.
This guide draws on Appendix 2 of HSE's Asbestos: The survey guide (HSG264). It summarises the main ACMs found in premises, where they are typically installed, their usual asbestos content and how readily they release fibres. It also covers what that means for your role and your legal duties under the Control of Asbestos Regulations 2012 (CAR 2012).
You cannot confirm whether a material contains asbestos by looking at it. If asbestos is suspected, leave the material undisturbed and seek professional advice. Laboratory analysis can confirm whether a sample contains asbestos.
Why the location and type of ACM matters
Asbestos was used in GB building products until its full prohibition in 1999. Three types are commonly encountered:
- Chrysotile (white) – the most common. It is found in cement products, textured coatings, floor tiles, textiles and many composites, and was used until November 1999.
- Amosite (brown) – found mainly in asbestos insulating board (AIB) and thermal insulation, and used until around 1980.
- Crocidolite (blue) – found mainly in sprayed coatings, lagging and some boards, and largely phased out by the late 1960s and early 1970s.
How much risk an ACM poses depends on how friable it is, its asbestos content and type, its condition, and whether it is likely to be disturbed. This is what drives material and priority assessments, the scope of a survey, and whether the work is licensed, notifiable non-licensed (NNLW) or non-licensed.
Summary of common ACMs
Summarised from HSG264, Appendix 2 table. Content figures are typical ranges, not values to design to.
| Material | Typical locations | Typical content / last used | Fibre release potential |
|---|---|---|---|
| Sprayed coatings | Fire protection to steel and concrete beams and columns, undersides of roofs and floors, acoustic insulation in theatres and halls | 55–85% asbestos in a cement binder; used up to 1974 | Very high if unsealed, damaged or delaminating. Debris can collect on ceilings, cabling and ventilation systems |
| Loose fill insulation | Loft insulation, fire-stopping around cables, acoustic insulation in bags under floors and in walls, fire door cores | Usually close to 100% asbestos | Very high. Becomes airborne readily |
| Thermal insulation (lagging) | Pipes, boilers, calorifiers, pressure vessels, heat exchangers | 6–85% asbestos; crocidolite in lagging until 1970, amosite until the 1970s | High. Depends on the lagging type and surface finish |
| Asbestos insulating board (AIB) | Partitions, ceiling tiles, service ducts, risers, firebreaks, soffits, canopies, fire doors, boiler and heater surrounds | 15–40% amosite and/or chrysotile; manufacture ceased in 1980 | High. Breaks easily, with significant release when sawn, drilled or abraded |
| Millboard | Heat and fire protection, electrical equipment, inside fire doors, duct linings | 37–97% asbestos | High. Low density, abrades easily |
| Paper, felt and cardboard | Electrical insulation, air-conditioning trunking linings, flooring backing, facings to boards | Up to ~100% chrysotile | Moderate to high if not encapsulated |
| Textiles, ropes and gaskets | Boiler, oven and flue seals, pipe and valve joints, fire blankets and curtains, radiator strings | Up to ~100%; gaskets usually ~90% | Moderate. Release when abraded, dry or removed |
| Asbestos cement | Roofing and cladding sheets, flues, cisterns and tanks, gutters, downpipes, drainage pipes, soffits, fascias | 10–15% (some up to 50%); chrysotile used until 1999 | Low when intact. Higher with weathering, power tools or roof cleaning |
| Textured coatings | Decorative coatings to walls and ceilings (eg Artex) | 3–5% chrysotile; added up to 1984, but old stock was used later | Low unless sanded, scraped or drilled |
| Bitumen products | Roofing felts, DPCs, gutter linings, mastics, underseals | Typically ~8% chrysotile; used up to 1992 | Low in normal use. Must not be burnt after removal |
| Floor coverings | Vinyl and thermoplastic tiles, paper-backed sheet vinyl, adhesives, magnesium oxychloride floors | Vinyl tiles ~7%; thermoplastic up to 25%; paper backing ~100% | Low in normal use. Substantial release if the backing is power-sanded |
| Reinforced plastics and resins | WC cisterns and seats, window sills, banister capping, lab worktops | 1–10% (resins up to 50%) | Low. Limited release when cut |
| Friction products and belts | Lift brakes, plant clutches, drive and conveyor belts | 30–70% chrysotile in resin; used up to 1999 | Low in use. Peaks occur during grinding or blow-cleaning |
Where ACMs are most often missed
HSG264 highlights several locations that are often overlooked in surveys, designs and refurbishment programmes:
- Overspray. Sprayed coatings often extend beyond the steel or concrete they were meant to protect, into recesses, voids and surrounding surfaces.
- Debris from delamination. Water ingress can cause sprayed coatings to come away, depositing debris on false ceilings, cable trays and inside ventilation systems.
- Mixed and repaired lagging. Installers used whatever was to hand, so materials often vary along the same pipe or boiler. Look closely at bends, valves and evident repairs.
- Composite panels. AIB may be sandwiched between, or faced with, plywood, strawboard, sheet metal, metal mesh or plasterboard. Its appearance can be misleading.
- Fire doors. Cores may contain AIB, millboard or loose asbestos behind wooden or metal facings. Some steel fire doors are asbestos-paper composites (eg Durasteel).
- Lift shafts, stairwells and service risers. These are commonly lined or faced with AIB.
- System-built buildings. In CLASP and similar construction, AIB was used for column fire protection, with offcuts used as packers.
- Concealed reinforcement. Chrysotile scrim tapes at wall joints, asbestos-containing fillers and wall plugs are integrated into plaster finishes and are very difficult to detect.
- Electrical installations. Fuse boxes and switchgear may contain flash guards, cable insulation or plaited asbestos tubing.
- Plant and equipment. Older boilers, heaters, ovens and machinery may contain gaskets, rope seals, friction products and textiles.
- Below floor finishes. Adhesives and paper backings beneath tiles and sheet flooring can contain far more asbestos than the visible surface.
Many of these locations are inaccessible to a management survey. They are exactly why a refurbishment and demolition (R&D) survey is needed before intrusive work.
What this means for your role
Building surveyors
Building surveys, dilapidations, condition reports and acquisition due diligence all depend on understanding where ACMs may be. Flag likely ACMs early, check whether an up-to-date asbestos survey and register exist, and advise clients where the existing survey won't support the work being planned. A management survey is not a suitable basis for refurbishment specifications.
Architects and designers
Under CDM 2015, information about asbestos is a key part of the pre-construction information. Design decisions on routing services, opening up walls, replacing ceilings or upgrading fire separation can all disturb ACMs. Commission or request an R&D survey at the earliest practical stage, scoped to the extent of the proposed works. That way the findings can inform the design, the programme and the cost plan rather than appearing as a delay once work starts.
Asset managers and duty holders
Under Regulation 4 of CAR 2012, those responsible for maintaining or repairing non-domestic premises (including the common parts of residential blocks) have a duty to manage asbestos. That means:
- Taking reasonable steps to find ACMs and assess their condition
- Presuming materials contain asbestos unless there is strong evidence otherwise
- Keeping an up-to-date asbestos register and a written asbestos management plan
- Making that information available to anyone liable to disturb ACMs, including contractors and maintenance staff
- Monitoring and reviewing the condition of ACMs regularly, usually through a periodic reinspection survey
Across a portfolio, the materials in the table above can help prioritise which buildings and areas need attention first. For example, sprayed coatings, lagging, AIB and loose fill in occupied or frequently accessed areas should take priority.
Licensed and non-licensed asbestos work
Whether work requires an HSE licence depends on the task, the material, its condition and the expected exposure. The examples below describe how common tasks are typically classified.
Work that usually requires an HSE-licensed contractor
- Sprayed coatings on walls, beams and columns
- Asbestos insulating board (AIB)
- Pipe and boiler lagging
- Loose asbestos in ceiling or floor voids
Work that is often non-licensed and may be notifiable
- Asbestos cement products
- Textured coatings
- Floor tiles, textiles and composites
The final categorisation depends on the specific material, its condition and the work method. It must always be confirmed by a suitable and sufficient risk assessment.
Regulatory update on four-stage clearance
The Control of Asbestos (Amendment etc.) Regulations 2026 amend the rules on who appoints the analyst responsible for site clearance certification.
- Independent clearance. From 25 November 2027, the licensed asbestos removal contractor must not appoint the analyst responsible for site clearance certification. The client or another duty holder can arrange the appointment independently.
- Survey quality. HSE strongly recommends using an accredited asbestos surveying organisation. Check the organisation’s current UKAS schedule for the type of survey you need.
Project teams can review procurement routes, contracts and programmes in advance so the analyst appointment is arranged independently.
How Armco can help
Armco Asbestos Consultants has over 20 years’ experience supporting duty holders, design teams and property professionals across the UK.
- Asbestos management surveys (UKAS-accredited) for occupied buildings and ongoing duty-to-manage compliance
- Refurbishment surveys scoped to your project before intrusive work, and demolition surveys before a building or structure is demolished
- Reinspection surveys (UKAS-accredited) to monitor the condition of known ACMs and keep your asbestos register current
- Targeted sampling and testing of specific suspect materials
- Asbestos registers and management plans
- Asbestos awareness training for staff and contractors
Armco is a UKAS-accredited inspection body (30781). Its published ISO/IEC 17020 schedule covers management surveys and reinspection of identified or suspected asbestos-containing materials. Samples are analysed by a UKAS-accredited laboratory. Survey reports are typically issued within 48 hours.
Frequently asked questions
Which buildings are most likely to contain asbestos?
Any non-domestic building built or refurbished before 2000. Buildings constructed between the 1950s and 1980s, and system-built schools and offices, commonly contain higher-risk materials such as AIB, sprayed coatings and lagging.
Is a management survey enough before refurbishment work?
No. A management survey is designed for normal occupation and maintenance. Before any refurbishment or demolition, an R&D survey of the areas affected is required. It is fully intrusive and is usually carried out with the area unoccupied.
When should architects commission an R&D survey?
As early as practicable, once the scope of works is defined well enough to set the survey extent. Early findings can inform the design, programme and cost plan, and form part of the CDM pre-construction information.
Can ACMs be identified visually?
No. Many asbestos and non-asbestos products look alike, and composites can hide AIB or asbestos paper. Confirmation requires sampling and laboratory analysis. Otherwise materials must be presumed to contain asbestos.
Who must appoint the clearance analyst after licensed removal?
From 25 November 2027, the licensed removal contractor must not appoint the analyst responsible for site clearance certification. The client or another duty holder can arrange the appointment independently.
Are asbestos surveys required to be carried out by an accredited organisation?
HSE strongly recommends using an accredited surveying organisation. Armco’s published UKAS schedule covers management surveys and reinspections.
What is a reinspection survey?
A reinspection survey checks the condition of ACMs already recorded in your asbestos register, so the material and priority assessments and your management plan stay up to date. It is typically carried out at least every 12 months, or more often for higher-risk or vulnerable materials.
Source: Health and Safety Executive, Asbestos: The survey guide (HSG264), Appendix 2. Contains public sector information licensed under the Open Government Licence v3.0. This page is general guidance and does not replace a suitable asbestos survey or professional advice.